پديد آورنده :
حاتمي، ربابه
عنوان :
استراتژي بهينه نگهداري و تعميرات پيشگيرانه با رويكرد اعتماد براي كليدهاي فشار قوي در نيروگاه ها و پست هاي فشار قوي
مقطع تحصيلي :
كارشناسي ارشد
گرايش تحصيلي :
سيستم هاي اقتصادي-اجتماعي
محل تحصيل :
اصفهان: دانشگاه صنعتي اصفهان،دانشكده صنايع و سيستم ها
صفحه شمار :
دوازده،98ص.: مصور،جدول،نمودار
يادداشت :
ص.ع.به فارسي و انگليسي
استاد راهنما :
علي زينل همداني
استاد مشاور :
حميدرضا كارشناس
توصيفگر ها :
توزيع آميخته وايبال , تابع نرخ خرابي هيبريد
تاريخ نمايه سازي :
11/3/89
استاد داور :
ناصر ملاوردي
دانشكده :
مهندسي صنايع و سيستم ها
چكيده فارسي :
به فارسي و انگليسي: قابل رويت در نسخه ديجيتالي
چكيده انگليسي :
Reliability based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants Robab Hatami r hatami@in iut ac ir 2010 03 10 Department of Industrial System Engineering Isfahan University of Technology Isfahan 84156 83111 Iran Degree M Sc Language Farsi Ali Zeinal Hamadani Hamadani @cc iut ac irAbstractElectric power industry have always try to provide reliable electricity to customers and atthe same time decrease system costs High Voltage circuit breakers are an essential part ofthe power network This study has developed a maintenance and replacement schedulingmodel for high voltage circuit breakers that minimize maintenance costs while maintainingthe acceptable reliability This model quantify the effect of maintenance on reliability Amixture weibull distribution is used to system s failure rate function and a hybrid hazardrate recursion rule based on the concept of age reduction factor and hazard rate increasefactor is built up to model system reliability The model is based on sequential imperfectmaintenance policy Whenever the equipment reliability reaches the threshold R animperfect preventive maintenance PM is performed on the equipment The optimalreliability threshold R is determined by minimizing the maintenance cost per unit time inthe residual life of the system Finally the model is applied on Esfahan Regional ElectricCompany circuit breakers and a maintenance and replacement scheduling is presented Keywords High Voltage circuit breaker Preventive maintenance Imperfect m Reliability Mixtureweibull distribution Hybrid hazard rate function
استاد راهنما :
علي زينل همداني
استاد مشاور :
حميدرضا كارشناس
استاد داور :
ناصر ملاوردي