شماره مدرك :
6160
شماره راهنما :
5757
پديد آورنده :
عسكري طباطبايي، محمد حسين
عنوان :

تحليل و رتبه بندي ريسك پروژه در صنايع بزرگ با استفاده از روش فازي

مقطع تحصيلي :
كارشناسي ارشد
گرايش تحصيلي :
سيستم هاي اقتصادي و اجتماعي
محل تحصيل :
اصفهان: دانشگاه صنعتي اصفهان، دانشكده صنايع و سيستم ها
سال دفاع :
1390
صفحه شمار :
[نه]،99ص.: مصور،جدول،نمودار
يادداشت :
ص.ع.به فارسي و انگليسي
استاد راهنما :
جمشيد پرويزيان
استاد مشاور :
رضا حجازي
توصيفگر ها :
مديريت ريسك , پروژه هاي فناوري اطلاعات , منطق فازي
تاريخ نمايه سازي :
25/5/90
استاد داور :
بهروز ارباب شيراني، مهدي بيجاري
دانشكده :
مهندسي صنايع و سيستم ها
كد ايرانداك :
ID5757
چكيده فارسي :
به فارسي و انگليسي: قابل رويت در نسخه ديجيتالي
چكيده انگليسي :
Analyzing and Ranking Project s Risk in Big Enterprises with a Fuzzy Method Mohammad H Askari Tabatabaei Mh askaritabatabaei@in iut ac ir Department of Industrial System Engineering Isfahan University of Technology Isfahan Iran Degree M Sc Language FarsiSupervisors Jamshid Parvizian japa@cc iut ac irAbstract Projects allocate voluminous share of resources and attention of a given organization in bigenterprises Quality of projects plays an indispensable role in this area Accomplishing a projecton its time cost and scope has a critical effect in eminence and development of an organization A project faces wide varieties of threats Analyzing and recognition of risks are of the main waysto reach goals of projects Due to the wide spreading range of risks haltering all of them is notthe case Therefore it is vital to rank risks to face them based on their priorities In this researchour focus is on proposing a new method for ranking in order to improve current algorithms Information Technology area has been chosen in this research Ranking projects in order toselect the best one and ranking risk factors of the chosen one are two main goals of this research Proposed algorithm has been tested on a case study Results show that both proposed projectshave the same priorities in the risk approach But priorities of utilizing resources to face riskfactors are somehow different Keywords 1 Risk Management 2 IT Projects 3 Fuzzy Logic
استاد راهنما :
جمشيد پرويزيان
استاد مشاور :
رضا حجازي
استاد داور :
بهروز ارباب شيراني، مهدي بيجاري
لينک به اين مدرک :

بازگشت