پديد آورنده :
همتيان، ميلاد
عنوان :
زمان بندي استوار ماشين هاي موازي يكسان با در نظرگرفتن مجموع مدت زمان در جريان كارها
مقطع تحصيلي :
كارشناسي ارشد
محل تحصيل :
اصفهان: دانشگاه صنعتي اصفهان، دانشكده صنايع و سيستم ها
صفحه شمار :
ده،99ص.: مصور،جدول،نمودار
يادداشت :
ص.ع.به فارسي و انگليسي
استاد راهنما :
قاسم مصلحي
استاد مشاور :
سروش عليمرادي
توصيفگر ها :
عدم قطعيت , شاخه و كران
تاريخ نمايه سازي :
28/1/92
استاد داور :
مهدي بيجاري، حميد مير مهدي
دانشكده :
مهندسي صنايع و سيستم ها
چكيده فارسي :
به فارسي و انگليسي: قابل رويت در نسخه ديجيتالي
چكيده انگليسي :
Robust scheduling of identical parallel machines considering total flow time Milad Hemmatian milad hemmatian@in iut ac ir Ghasem Moslehi Supervisor moslehi@cc iut ac ir Department of Industrial and Systems Engineering Isfahan University of Technology Isfahan 84156 83111 Iran Degree M Sc Language Persian Date 2012 12 11 Abstract Scheduling problems have been widely investigated over the last five decades Production scheduling problem is an extensive problem in industrial production processes and more effective on human resource effectively efficiency corporations competitiveness Most of the research has been concentrated on deterministic scheduling problems in which all problem parameters such as processing times duedate are predetermined In real world however nondeterministic and probabilistic phenomena such as machine breakdowns prolonged jobs processing time worker illnesses delays in raw material delivery and new work in process jobs during the execution of the scheduling plan may cause deterministic scheduling solution efficiency to loss Several methods such as robust scheduling to solve such problems is developed A new approach to dealing with uncertain data in a scheduling problem is the robust scheduling approach which allows one to arrange an initial schedule in such a way that any variation during the implementation of the schedule will cause the least possible changes in the initial schedule Several types of robust scheduling problem solution approach are scenario based approach surrogate measures stability measures Another one is robust method which has been used probabilistic approach Result of robust approach is establishinig a schedule that maximize the probability of not exceeding objective function from deterministic amount usually determined by manager In this thesis we concentrate on the problem of maximizing the probability of having the total jobs processing time on identical parallel machines not problem RSP In order to solve the problem optimally we present several theorems exceeding a predefined value We also assume the processing times to be probabilistic e g the whereby the search space is drastically reduced A Branch and Bound B B method is also proposed whose branching procedure is particularly designed for the problem considered A number of lemmas to determine dominant sets a number of dominance rules and efficient lower and upper bounds are presented to solve optimally problems with 45 jobs on 5 machines Finally comparisons will be made to demonstrate that the proposed method which is especially designed to deal with several machines is much more efficient than those designed for handling single machines Keywords Uncertainty Robust scheduling Identical parallel machines Total flow time Branch and bound
استاد راهنما :
قاسم مصلحي
استاد مشاور :
سروش عليمرادي
استاد داور :
مهدي بيجاري، حميد مير مهدي