پديد آورنده :
توكلي، امير
عنوان :
مديريت و برنامه ريزي سفارشات توليدي پياده سازي: كارگاه مكانيك شركت صنايع اپتيك ايران
مقطع تحصيلي :
كارشناسي ارشد
محل تحصيل :
اصفهان: دانشگاه صنعتي اصفهان، دانشكده صنايع و سيستم ها
صفحه شمار :
چهارده، 84ص.: مصور، جدول، نمودار
يادداشت :
ص.ع. به فارسي و انگليسي
استاد راهنما :
جمشيد پرويزيان
استاد مشاور :
مرتضي راستي برزكي
توصيفگر ها :
كار كارگاهي انعطاف پذير , سيستم اطلاعاتي , بصري سازي برنامه
تاريخ نمايه سازي :
16/3/94
استاد داور :
مهدي بيجاري، محمد حسين شركت
تاريخ ورود اطلاعات :
1396/10/02
رشته تحصيلي :
صنايع و سيستم ها
دانشكده :
مهندسي صنايع و سيستم ها
چكيده انگليسي :
62 Isfahan University of Technology Department of Industrial Engineering Management and Planning of Manufacturing Orders Implementing the Mechanical Workshop of the OPTIC Industries Amir Tavakoli amir tavakoli@in iut ac ir Date of Submission 2015 01 13 Department of Industrial and Systems Engineering Isfahan University of Technology Isfahan 84156 83111 IranDegree M Sc Language PersianSupervisor Jamshid Parvizian japa@cc iut ac irAbstractThe present study is an attempt to design and develop a software package for themanagement and scheduling of manufacturing orders in workshops dealing withflexible job shop scheduling problem A flexible job shop is a generalization of the job shop and the parallel machineenvironments In this case instead of machines in series there are work centerswhere every center has a number of identical machines in parallel The computationalcomplexity of this problem is NP Hard Thus in addition to presenting amathematical model to solve the small size problems a genetic algorithm is proposedfor large scale problems The software package provides information management oforders and creates schedules Moreover it has the ability to display schedules as Gantchart The current research is a case study in the the Mechanical Workshop of theOPTIC Industries and is implemented to increase the efficiency of a productionsystem by reducing the manufacturing and delivery time as well as reducing thecosts of managing and planning GAMS and visual studio 2010 has been utilized tocode the exact solution the genetic algorithm and making Gant chart SQL Server wasalso used to create the database of the information system Key words Flexible Job Shop Scheduling parallel machines Operation Scheduling Machine Selection Information System Genetic Algorithm
استاد راهنما :
جمشيد پرويزيان
استاد مشاور :
مرتضي راستي برزكي
استاد داور :
مهدي بيجاري، محمد حسين شركت