پديد آورنده :
راستي برزكي، مرتضي
عنوان :
مدل يكپارچه تخصيص موعد تحويل ، تخصيص منابع و زمانبندي توليد و توزيع در زنجيره تامين
محل تحصيل :
اصفهان: دانشگاه صنعتي اصفهان، دانشكده صنايع و سيستم ها
صفحه شمار :
پانزده،190ص.: مصور،جدول،نمودار
يادداشت :
ص.ع.به فارسي و انگليسي
استاد مشاور :
محمد مهدوي مزده
تاريخ نمايه سازي :
5/12/91
استاد داور :
فريبرز جولاي،قاسم مصلحي، مصطفي زنديه
دانشكده :
مهندسي صنايع و سيستم ها
كد ايرانداك :
ID500 دكتري
چكيده فارسي :
به فارسي و انگليسي: قابل رويت در نسخه ديجيتالي
چكيده انگليسي :
IUT 77142 Degree Ph D Title Integrated Due Date Assignment Resource Allocation and Production and Outbound Distribution Scheduling in Supply Chain Author Morteza Rasti Barzoki Supervisor Dr S R Hejazi Assoc Prof Department Department of Industrial Systems Engineering Isfahan University of Technology Date January 13 2013 Language Persian Abstract In this thesis an integrated due date assignment and production and batch delivery scheduling problem with controllable processing times for multiple customers is addressed therefore four sets of decisions including due date assignment resource allocation and production and distribution scheduling are involved simultaneously This model can also be applied for quoting delivery times when some parts of the jobs may be outsourced Consider a supply chain scheduling problem in which n jobs have to be scheduled on a single machine and delivered to K customers or to other machines for further processing in batches A common due date is assigned to all jobs of each customer The objective is to minimize the sum of the total weighted number of tardy jobs and the total due date assignment the total resource allocation and the total batch delivery costs We showed that the mentioned problem is ordinary NP hard Four new approaches including an Integer Programming IP model a Heuristic Algorithm HA a pseudo polynomial Dynamic Programming DP approach and a Branch and Bound B B method are developed Also a Fully Polynomial Time Approximation Scheme FPTAS is developed for single customer Computational tests are used to demonstrate the efficiency of the developed methods In addition some other related issues were studied Keywords Supply chain scheduling due date assignment resource allocation outsourcing production and distribution scheduling
استاد مشاور :
محمد مهدوي مزده
استاد داور :
فريبرز جولاي،قاسم مصلحي، مصطفي زنديه