شماره مدرك :
7583
شماره راهنما :
7055
پديد آورنده :
لياقت پور، زهرا
عنوان :

بهينه سازي سيستم حمل و نقل كاركنان صنايع بزرگ: مطالعه موردي مجتمع فولاد مباركه اصفهان

مقطع تحصيلي :
كارشناسي ارشد
گرايش تحصيلي :
راه و ترابري
محل تحصيل :
اصفهان: دانشگاه صنعتي اصفهان، دانشكده عمران
سال دفاع :
1391
صفحه شمار :
يازده،72ص.: مصور،جدول،نمودار
يادداشت :
ص.ع.به فارسي و انگليسي
استاد راهنما :
مهدي ابطحي، نادر شتاب بوشهري
توصيفگر ها :
جانمايي , مسير يابي , GIS , TransCAD
تاريخ نمايه سازي :
20/12/91
استاد داور :
محمدرضا جعفري، بهروز ارباب شيراني
دانشكده :
مهندسي عمران
كد ايرانداك :
ID7055
چكيده فارسي :
به فارسي و انگليسي: قابل رويت در نسخه ديجيتالي
چكيده انگليسي :
Optimization of Employee Transport Facilities of Mega Industries Case Study Mobarake Steel Complex Zahra Liaghatpour z liaghatpour@cv iut ac ir Date of Submission 2012 9 21 Department of Civil Engineering Isfahan University of Technology Isfahan 84156 83111 IranDegree M Sc Language FarsiSupervisors Dr Seyed Mehdi Abtahi mabtahi@cc iut ac ir Dr Seyed Nader Shetab Boshehri shetab@cc iut ac irAbstractWork trips have attracted the attention of many urban planners This is simply because of its share of total trips inpeak traffic hour In industrial metropolitan areas a significant part of work trips is to the outskirts and by theservices of different companies If offered heedlessly these services can generate serious problems includinglack of efficiency traffic congestion employee dissatisfaction air pollution and energy consumption This study by the goal of optimization of such services tests the case of home to work transport system of Mobarake steelcomplex This study has been accomplished by the close collaboration of transport experts the police and thetransportation management of the complex Increasing efficiency and reducing traffic congestion are the goalsand employee satisfaction and traffic conditions set by the police are the constraints The basic paces ofoptimization are 1 data collection 2 declaration of viewpoints and solution policies 3 allocate stops 4 definerouts Data collection and stops allocation are done by the use of ArcGIS software and the routing pace was doneby the use of TransCAD GIS Key WordsOptimization Allocation Routing Employee transport services GIS TransCAD
استاد راهنما :
مهدي ابطحي، نادر شتاب بوشهري
استاد داور :
محمدرضا جعفري، بهروز ارباب شيراني
لينک به اين مدرک :

بازگشت