پديد آورنده :
درخشنده قهفرخي، ياسر
عنوان :
برنامه ريزي توليد كوتاه مدت در زير شبكه هاي صنعتي
گرايش تحصيلي :
مهندسي برق
محل تحصيل :
اصفهان: دانشگاه صنعتي اصفهان، دانشكده برق و كامپيوتر
صفحه شمار :
ده،158ص.: مصور،جدول،نمودار
يادداشت :
ص.ع.به فارسي و انگليسي
استاد راهنما :
محمد اسماعيل همداني گلشن
استاد مشاور :
محمد صادق قاضي زاده
توصيفگر ها :
به مدار آوردن واحدها , پخش بار بهينه , برنامه ريزي احتمالاتي
تاريخ نمايه سازي :
14/8/92
استاد داور :
گئورك قره پتيان، محمدرضا آقا محمدي، غلامرضا يوسفي
دانشكده :
مهندسي برق و كامپيوتر
كد ايرانداك :
ID573 دكتري
چكيده فارسي :
به فارسي و انگليسي: قابل رويت در نسخه ديجيتالي
چكيده انگليسي :
Short Term Generation Scheduling in Industrial Microgrids Sayed Yaser Derakhshandeh y derakhshandeh@ec iut ac ir Date of Submission August Department of Electrical and Computer Engineering Isfahan University of Technology Isfahan Iran Supervisor Mohammad Esmail Hamedani Golshan hgolshan@cc iut ac ir Advisor Mohammad Sadegh Ghazizadeh ghazizadeh@pwut ac ir Advisor Mohammad Ali Masoum m masoum@curtin edu au Department Graduate Program Coordinator Masood Omoomi Abstract Generation scheduling in industrial microgrids IMGs is an important issue which has not received much attention in the literature IMGs consist of many factories with distributed energy resources DERs and electric loads that heavily rely on combined heat and power CHP systems This thesis illustrates that UC in an IMG is not solely a profit based UC PBUC or a security constrained UC SCUC problem Therefore a new profit based security constrained UC PB SCUC formulation is proposed for IMGs that includes both microgrid security and factories constraints while utilizing the generators waste heat to fulfill thermal requirements The microgrid controller MGC will solve the PB SCUC problem to minimize the final production cost through maximization of the profit by selling electricity to the upstream network As each DER and boiler may have an individual owner an approach based on the game theory is also implemented to fairly allocate the cost saving among factories participating in the generation process The new generations of IMGs are expected to also include renewable DERs and plug in electric vehicles PEVs with different power ratings and charging characteristics This thesis also proposes a profit based security constrained unit commitment PB SCUC formulation for IMGs with PEV charging and renewable DERs that includes microgrid security and factories constraints as well as the PEV charging requirements Also in this thesis a method based on dynamic optimal power flow DOPF over a hour period presented which includes security constrained optimal power flow SCOPF IMG s factories constraints PV storage constraints and PEVs dynamic charging constraints Finally a novel approach for stochastic generation scheduling in an IMG is presented This method is based on scenario based method and linearization of the nonlinear formulations Isfahan University of Technology Isfahan Iran Power and Water University of Technology Tehran Iran Curtin University Perth WA Australia PDF created with pdfFactory trial version www pdffactory com
استاد راهنما :
محمد اسماعيل همداني گلشن
استاد مشاور :
محمد صادق قاضي زاده
استاد داور :
گئورك قره پتيان، محمدرضا آقا محمدي، غلامرضا يوسفي