پديد آورنده :
خدابنده، مهدي
عنوان :
كمينه كردن مجموع وزني كارهاي تاخيري و هزينه هاي ارسال براي زمان بندي يكپارچه توليد و توزيع در زنجيره تامين با در نظرگرفتن مسيريابي
مقطع تحصيلي :
كارشناسي ارشد
محل تحصيل :
اصفهان: دانشگاه صنعتي اصفهان، دانشكده صنايع و سيستم ها
صفحه شمار :
سيزده،134ص.جدول،نمودار
يادداشت :
ص.ع.به فارسي و انگليسي
استاد مشاور :
مرتضي راستي برزكي
تاريخ نمايه سازي :
1/10/92
استاد داور :
مهدي بيجاري، مهدي علينقيان
دانشكده :
مهندسي صنايع و سيستم ها
چكيده فارسي :
به فارسي و انگليسي: قابل رويت در نسخه ديجيتالي
چكيده انگليسي :
IUT 77142 Degree M Sc Title Minimizing Total Weighted Number of Tardy Jobs and Delivery Costs for an Integrated Production and Distribution Scheduling with VRP in Supply Chain Author Mahdi Khodabandeh Supervisor Dr S R Hejazi Assoc Prof Department Department of Industrial Systems Engineering Isfahan University of Technology Date September 17 2013 Language Persian Abstract Supply chain is set of factors that are in collaboration to produce a product or service for customers Supply chain management is an important subject which is theoretically and applicably considered by researchers for years This subject is very widespread and variable so it has denoted a lot of researches to itself One of the main purposes that this subject has been noticed widely in literature is integrating and coordinating decisions in supply chain Production and distribution are two crucial operations in supply chain which should be scheduled integrated to achieve an optimum efficiency Considering the importance of total weighted number of tardy jobs in this thesis exact and approximate methods are proposed to solve the problem of integrated production and distribution scheduling in supply chain with Vehicle routing Problem VRP to minimize total weighted number of tardy jobs and delivery costs This problem which is strongly NP Hard is considered for the first time In this thesis a mixed integer programing MIP model is proposed to solve the problem Because of high complexity of the problem MIP model is not able to solve big instances in a reasonable time For this reason a heuristic algorithm and two metaheuristic algorithms including Genetic Algorithm GA and Tabu Search TS are proposed to solve this problem Also computational tests are used to survey the efficiency of proposed algorithms ANalysis Of VAriance ANOVA is used to analyze the results The computational results show that our heuristic and metaheuristic algorithms are efficient Computational results show that GA outperforms TS in both large and small instances Keywords Supply chain scheduling Number of tardy jobs Routing Production and distribution scheduling PDF created with pdfFactory trial version www pdffactory com
استاد مشاور :
مرتضي راستي برزكي
استاد داور :
مهدي بيجاري، مهدي علينقيان